Preparation of the Evaluation of Infrastructure Development Implementation for the Regional Development Planning Agency of the East Java Provincial Government
Consulting Services for Project Companion on Industrial Land Preparation for NPK at PT Pupuk Kalimantan Timur
Engineering Consultant Services for the Construction of the BBM (Fuel Oil) Terminal LLP in Tuban at PT Pertamina
Risk Analysis of Schedule Delays and Cost Impacts for the Jambaran Tiung Biru (JTB) Project at SKK Migas
Feasibility Study Analysis and Life Assessment Report Review for the Procurement of Equipment at the Surabaya Container Terminal PT Pelindo
Consultant Services for the Planning of Channel Reconstruction and Drainage System Construction in the Southern Area of Terminal T2 at Juanda Surabaya Airport
Front End Engineering Design (FEED) for the Tutung Field Development Project for Starborn Energy in Bontang
Technical Assistance for Integrated Work Procurement for the Tangga Dam Company of Jasa Tirta
Preparation of Standard Unit Prices (SSH), Main Activity Unit Prices (HSPK), and Standard Expenditure Analysis (ASB)
Preparation of the Evaluation of Infrastructure and Regional Development Implementation Results
Appraisal of Abandonment and Site Restoration Cost Estimates
Preparation of Feasibility Study Documentation for Road Construction