Fullname | A.A.B. Dinariyana Dwi P., S.T., MES., Ph.D. |
NIP | 197505102000031001 |
NIDN | 0010057505 |
kojex[at]its.ac.id | |
Educational Background | S1: Marine Engineering, ITS Surabaya S2: Environmental Studies, Univ. of Tokyo Japan S3: Environmental Studies, Univ. of Tokyo Japan |
Publication | | sinta | scholar | scopus | |
Mata kuliah | ME 184307 Statistika Rekayasa (Statistics Engineering) ME 184906 Manajemen Risiko (Risk Management) ME 184918 Riset Operasi (Operation Research) ME 184203 Teori Bangunan Kapal (Ship Building Theory) ME 184410 Konstruksi Kapal (Ship Construction) |
Penelitian | 2015 – Pengembangan Prototipe Fasilitas Monitoring Keselamatan Kapal Berbasis Data Automatic Identification System (AIS) 2016 – Desain Sistem Distribusi Energi (LNG) Guna Menjamin Ketahanan Energi Nasional 2016 – Produksi Fasilitas Monitoring Keselamatan Instalasi dan Bangunan di Laut Berbasis Automatic Identification System (AIS) |
Pengabdian Masyarakat | 2014 – Penyusunan Dokumen UKL UPL Terminal Khusus LNG Terapung PT. Padma Energi Indonesia Di Celukan Bawang 2014 – Risk Assessment Of Platform PHE-7 And Pipeline PHE-7 To PHE-48 Due To Marine Traffic 2014 – Pipeline Risk Assessment River Crossing 2014 – Jasa-Jasa Penilaian Risiko Penggunaan Mooring Vessel Untuk Instalasi Fasilitas Bawah Laut TSB Tahap II (Risk Assessment Services Of The Use Of Mooring Vessel For Instalation Of Subsea Facilities On TSB Phase II) 2014 – Geotechnical Impact Assessment Of Reclamation Project To Petronas Pipeline 2014 – Risk Assessment Of Flowline River Crossing Installation For RVX-13 dan RVX-18 2015 – Provision Of Blanket 16″ Pipeline Engineering Study Services 2015 – Jasa Kajian Penilaian Resiko Proyek Construction Jetty 2015 – Risk Assessment On 14″ Subsea Gas Pipeline Of PT PHE WMO Due To Port Development Of PT KIAS 2015 – Jasa Konsultansi Bidang Distribusi LNG 2015 – Lengo Offshore Pipeline’s Nearshore Route Risk Assessment Study 2015 – Risk Assesment On Subsea Gas Pipeline Of PT. PHE WMO Due To Repair Activity Of Sea Water Pipeline Of PT Smelting 2015 – Risk Assesment Shore Approach Chanell Access 2015 – Kajian Keselamatan Dan Operasional Terminal LNG Benoa 2015 – Jasa Konsultansi Pemanfaatan Gas Bumi Untuk Transportasi Laut 2016 – Risk Assessment For MDK Field Development 2016 – Lengo Subsea Pipeline Risk Assesment Study 2016 – Lengo WHP Risk Assesment Study Research and Study 2017 – Design of Traffic Separation Schemes (TSS) In The Bintuni Bay Area |