Christiono Utomo, ST, MT, Ph.D.

Christiono Utomo, ST, MT, Ph.D.

Nama Dosen Christiono Utomo, ST, MT, Ph.D.
Position Head of Construction Management Laboratory, Department of Civil Engineering, FTSPK, ITS.
NIP 196703192002121005
NIDN 0019036707
Jabatan Lektor Kepala
Email christiono@ce.its.ac.id

S1 UNS (1993)
S2 INSTITUT TEKNOLOGI SEPULUH NOPEMBER (2001)
S3 UNIV. TECH. PETRONAS MALAYSIA (2010)

Keywords: Value, Collaborative, Sustainable

  • Value management in design and construction
    (design management, collaborative design, value-based decision, function analysis, life cycle cost)
  • Project investment and financing
    (finance and business strategy, consumer behavior and pricing analysis, highest and best use analysis, capital budgeting, capital structure and cost of capital, market feasibility, project valuation and corporate real estate)
  • Sustainable science in built environment
    (green building, sustainable construction, implication of green application on project finance)
  • 2018
    Project manager for feasibility and planning of
    Feasibility and risk management of LRT-Tram Surabaya
  • 2016
    Project manager for planning and design of
    1. Building facade of the PLN office Banjarbaru, construction cost is 2,5 billion IDR 2. Indoor tennis courts of the PLN office Banjarbaru, construction cost is 1,6 billion IDR
  • 2007-2015
    Project manager for feasibility and planning of:
    1. Bank Muamalat Sulawesi Selatan
    2. Water resource tariff (Kementrian PU)
  • 2003-2007
    Project manager/officer for feasibility and planning of:
    1. MERR IIC Bridge Surabaya
    2. Civil work design for natural disaster at Trawas
    3. A gold mine in Kalimantan
  • 2000-2004
    Project manager for planning and design of
    1. A three star hotel at Jogjakarta, 2 floors, construction cost is approx. 25 billion IDR
    2. A private hospital at Jogjakarta, 2 floors, construction cost is approx. 30 billion IDR
  • 1995-1998
    A. Project coordinator / manager for project development of
    1. Ciputra golf villas project, 2 floors, 8 billion IDR construction cost and total building area approximately 5500 m2.
    2. Marketing office project, 2 floors, 2.5 billion IDR construction cost and total building area approximately 1500 m2.
    3. Masjid Citra Raya, 2 floors, 1.5 billion IDR construction cost and total building area approximately 2000 m2
    B. Assistant project coordinator for project development of
    1. Bukit golf gate project, a Sculpture, 0.5 billion IDR construction cost
    2. Power house for town center and town house project, 0.5 billion IDR construction cost.
    3. Town center (shop houses and supermarket) project), 3 floors and 17,5 billion IDR development cost, total building area approximately 11.000 m2.
  • 1995
    Project architect for Paragon apartment, 2 Blocks of 21 floors, 20 million USD contract value, and total area building approximately 7.000 m2.
  • 1994
    Project architect for Rental House, Jogjakarta, design and construction, 2 floors, 0.75 billion IDR construction cost and total building area approximately 750 m2.
  • 1993-1994
    Project architect, Project head of general affairs / assistant deputy project manager for Shangri-La hotel Surabaya project, 17 floors, 70 billion IDR contract value and total building area approximately 47.000 m2.
  • 1991-1992
    Auto CAD operator/ Junior Architect for Bank Indonesia Jambi and Pakanbaru
  • 1990
    Architect of Kedungwuni shop houses, Pekalongan, design and construction, 3 floors, 450 million IDR construction cost and total building area approximately 1500 m2
  • 1989
    Developer of National book fair, Surakarta, interior design and construction, 70 million IDR construction cost
  • Design Management
  • Project Cost and Time Management
  • Construction Project Feasibility Study
  • Time and Cost Optimization
  • 2019 – Present Advisory Board Member, KADIN Surabaya – Surabaya Chamber of Commerce and Industry
  • 2016 – 2018 Head of Finance and General Affairs, Management of Technology, ITS
  • 2012 – 2015 Advisory Board Member ITS, Secretary of Finance and Planning
  • 2010 – 2014 Visiting Associate Professor and External Examiner for Faculty of Civil Engineering, Universiti Teknologi Malaysia (UTM).
  • 2010 – 2011 Management Representative (MR) ISO 9001:2008 for Civil Engineering Department, Institut Teknologi Sepuluh Nopember.
  • 2009 – Present
    Journal Reviewer: Journal of Cleaner Production (Elsevier), Journal of Structure and Infrastructure Engineering (Taylor & Francis), Malaysian Journal of Civil Engineering, Facilities and ECAM (Emerald), World Academy of Science and Engineering (WASET) and Majalah IPTEK (ITS), Indonesian Journal of Construction Engineering and Sustainable Development (Trisakti University), Urban and Regional Planning (Podomoro University)
  • 2007 – 2010 Assistant Professor for Construction Management Course and Final Year Project Universiti Teknologi PETRONAS (UTP), Malaysia.
  • 2003 – Present
    Lecturer and Researcher for:
    a. Undergraduate and Graduate (Master and Doctoral) Program in Civil Engineering
    b. Master Program in Architecture (Real Estate)
    c. Master Program in Technology Management (Project Management)
    d. Master Program in Mechanical Engineering (Energy Management)
  • 2003 – 2007
    Co-Founder and Head of Construction Management Laboratory, ITS Indonesia.
  • 1990 – 2004
    a. Project Architect for Paragon Apartment Surabaya
    b. Head of General Affairs for Hotel Shangri-La Surabaya
    c. Project Manager and Coordinator for Non Housing of PT Ciputra Surya, Tbk.
  1. 2020 Peran Sumber Daya Konstruksi Untuk Keunggulan Kinerja Properti Ritel Melalui Kewirausahaan dan Manajemen Pengetahuan; IDR 174 million; Tim Leader; Ristek/BRIN
  2. 2020 Pemodelan Otomatisasi Kolaborasi Pada Building Information Modelling (BIM) Untuk Keandalan Kinerja Mandiri; Energi Hunian Perkotaan; IDR 147 millionim Leader; Ristek/BRIN
  3. 2020 Pengukuran Kinerja Desain Berbasis Nilai Untuk Penerimaan Pemangku Kepentingan Pada Keberlanjutan; Pengembangan Hunian Perkotaan; IDR 37,3 million; Tim Leader; Ristek/BRIN
  4. 2020 Penilaian Keberlanjutan Proyek Infrastruktur Jembatan dan Jalan untuk Produktifitas Pembangunan di Jayapura; IDR 40 million; Tim Leader; Ristek/BRIN
  5. 2020 Pengaruh Penggunaan Konsep Bangunan Hijau Terhadap Keputusan Keberlanjutan Ekonomi Properti di Surabaya; IDR 50 million; Tim Leader; ITS
  6. 2019 Pendekatan Integrasi Sistem Desain Untuk Keberhasilan Desain Pada Properti Residensial Bertingkat Tinggi; IDR 50 million; Tim Leader; KemristekDikti
  7. 2019 Pengembangan Model Kinerja Properti Residensial Bertingkat Tinggi Pada Peningkatan Keberlanjutan Tata Ruang Perkotaan; IDR 200 million; Tim Leader; KemristekDikti
  8. 2019 Indikator untuk menilai manfaat sosial bangunan gedung publik terhadap masyarakat; IDR 56 million; Member; KemristekDikti
  9. 2018 Pengembangan model kinerja properti residensial bertingkat tinggi pada peningkatan keberlanjutan tata ruang perkotaan; IDR 80 million; Tim Leader; Penelitian berbasis Kompetensi RistekDikti
  10. 2017-2018 Pengembangan tata ruang pasar perkotaan untuk produktivitas lahan tertinggi dan terbaik berwawasan lingkungan; IDR 335 million; Tim; Leader; PUPT RistekDikti
  11. 2016 Stándar beaya rumah murah untuk wilayah Bali, NTB, NTT, Kalimantan Selatan, Kalimantan Tengah, Kalimantan Timur; Approx. IDR 350 million; Financial Analyst; BPTPT PU Denpasar – ITS
  12. 2015-2016 LNG storage tanks and regasification TTL Gresik, economics pre-feasibility study for two 125.000m2 full containment tanks and approx. $624 million CAPEX; Approx. IDR 600 million; Financial Analyst; PT Pertamina – ITS
  13. 2014-2015 Pengembangan konfigurasi spasial dan nilai ekonomi urban heritage yang adaptif dan kolaboratif; IDR 190 million; Tim Leader; PUPT; Ristek Dikti JTI ITS
  14. 2014-2015 Penentuan strategi dan kebijakan penelitian ITS 2015-2019; IDR 40 million; Member; ITS
  15. 2014-2015 Edutainment dan ICT: integrasi edutainment dan ICT; IDR 100 million; Member; PUPT Ristekdikti ITS
  16. 2014-2015 Risk analysis for new intake of cooling process; IDR 200 million; Risk analyst; PT PJB – ITS
  17. 2013 A concept of economics value for cost of water resource; IDR 100 million; Economic Analyst; Direktorat SDA PU
  18. 2012-2013 Coalition formation algorithmn and agreement options model for Industrialized Building System (IBS) design selection; IDR 290 million; Tim Leader; International UTM Malaysia
  19. 2011-2011 Development of a negotiation support system for value management and engineering in construction.; IDR 100 million; Tim Leader; ITS – UTP Malaysia
  20. 2009-2010 Penyusunan model pengukuran kinerja real estate perusahaan; IDR 300 million; Tim Leader; MMT ITS