Yusroniya Eka Putri Rachman W, ST, MT.

Yusroniya Eka Putri Rachman W, ST, MT.

Nama Dosen Yusroniya Eka Putri Rachman W, ST, MT.
NIP 198408282008122004
NIDN 0028088401
Jabatan Assisten Ahli
Email iput@ce.its.ac.id

S1 INSTITUT TEKNOLOGI SEPULUH NOPEMBER (2006)
S2 INSTITUT TEKNOLOGI SEPULUH NOPEMBER (2008)
S3 INSTITUT TEKNOLOGI SEPULUH NOPEMBER

1. Budget Planning and Schedulling
2. Sustainability Construction
3. Time and Cost Management
4. Project Management
5. Operation Research
6. Construction Method and Material
7. Building Information Modelling
8. Value Engineering

[Scholar] [Scopus] [Sinta] [RESITS]

1. Construction Management
2. Construction Project Feasibility Study
3. Construction Planning and Procurement
4. Operation Research
5. Decision Making Techniques
6. Project Cost and Time Optimization
7. Project Management Supervision and Controlling
8. Value Engineering
9. Health, Safety and the Environment (HSE)
10. Asset Management

• December 2008 – Present Lecturer in Civil Engineering – ITS
• January 2020 – Dec 2020 Commitment Making Official (CMO) of Infrastructure Project –Institut Teknologi Sepuluh Nopember (ITS), Surabaya, Indonesia
• January 2020 – Dec 2020 Head of the Sub-directorate of Infrastructure and Logistics Planning –Institut Teknologi Sepuluh Nopember (ITS), Surabaya, Indonesia
• March 2019 – Dec 2019 Head of the Sub-directorate of Budget Planning –Institut Teknologi Sepuluh Nopember (ITS), Surabaya, Indonesia
• January 2008 – Nop 2008 Member of Consultant Department Research And Development Blitar-Jawa Timur, Indonesia
• Nop 2006 – Jan 2008 Accounting Staff of Program Pascasarjana – Institut Teknologi Sepuluh Nopember (ITS), Surabaya, Indonesia

1. Putri YE, Indryani R [2019]. “Education Unit Cost Calculation Model to Determine ITS Single Tuition Fees”. Police Review Research Report- Grant ITS.
2. Adi TJW, Putri YE, Lasminto U [2018]. “Development of an Android-based Land and Building Tax Value Estimation Model”. Higher Education Excellence Applied Research Report-Government Fund.
3. Putri YE Alrasyid H, Adi TJW [2017]. “Owner Estimate (OE) and Bid Price Model of Standardization Precast Channel”. Productive Research Report-Department Civil Engineering ITS.
1. Putri YE, Irmawan M, Al Rasyid H, [2017]. “Evaluation and Assessment of Police Dormitory Buildings Colombo Blok A dan B”. Productive Research Report- Public Works – Human Settlements and Spatial Planning Surabaya. 2. Putri YE [2014]. “Implementation of Alternative Method of Mixture of Materials, Batako Making Technique and Financial Analysis In Accordance with SNI Requirements” Productive Research Report – Program Iptek Bagi Masyarakat (IbM) DIKTI
3. Wiguna, PA, Putri YE, [2010]. “Construction Staff’s Job Performance Model” Advanced Productive Research Report-ITS DIKTI.
4. Wiguna, PA, Putri YE, [2009]. “Construction Worker’s Job Performance Model” Productive Research Report-ITS DIKTI.
5. Putri,YE [2008]. “The Factors That Influence Job Performance of Construction Worker in Surabaya”. Thesis Report Master Of Engineering, Civil Engineering Department ,Faculty of Civil Engineering And Environmental ITS.
6. Hanafie,SRMJ, Putri,YE [2008]. “Gender Manistreaming in Suburb Development Planning”. Productive Research Report Department Research And Development Blitar-Jawa Timur.
7. Indryani,R, Putri,YE, Indri,D. [2008]. “Gender Analysis in Construction Project Management”. Productive Research Report-ITS DIKTI.